
If you’ve driven down Michigan Rd (just north of 116th street) in the past day or two you may have noticed some partial lane blockage in the southbound direction. Sorry for the inconvenience but we’re adding some much needed “wiggle room” to our parking lot. The expansion to the structure itself was only a portion (albeit quite a large chunk) of the addition. We’re also adding more parking, a turnaround space, an outdoor employee terrace, a retention pond and a plethora of beautiful landscaping.
Here are a few photos from the process.

The finished product. This was actually shot from my window believe it or not. Not the one that got walled up obviously.

As I was across the highway shooting I thought the front of the house was looking pretty good considering it's smack dab in the middle of a construction project.
That’s all for today. We should be getting trim done next week. Once we start installing our awesome Signature 8000 windows and siding things will really start to look complete. Thanks for checking out the blog and commenting. Enjoy the weather. It’s been nice (not rainy) lately but boy is it hot!! Stay hydrated!
Tags: addition, apex energy solutions, bright ideas blog, concrete, construction, curb, indiana, indianapolis, replacement windows, signature 8000







love the black and white—-feels like an Apex documentary! Looking very good. Any sign of the Apex snapper??